Phase 1 Fitout
The following are the areas which will be tackled first. The estimated time to perform this is approximately 3months.
- Change the mast compression post so it can be fixed to the cabin top.
- Installation of the mast step on the deck.
- Build the new under table cupboard and install together with galley bench top and table.
- Install the galley cupboards and shelving in the passage way.
- Re-align aft berth to be fore-aft.
- Relocate the battery switch and wiring to new location.
- Replace existing and install additional interior lights with LED lamps.
- Install new water tanks under the settee and remove tank from lazarette.
- Replace deck hatches (existing don't seal, locks missing).
- Install two burner alcohol stove.
- Mount the headsail tracks and mainsheet block deck fittings.
- Make the settee backrest and cushions.
Phase 2 Fitout
Enhancement of the interior for comfort, and the making the boat sea worthy, will be in the second phase. The estimated time to perform this is approximately 2months.
- Installation of the entertainment systems.
- Build new companionway steps.
- Relocation of the engine control panel to new companionway stairs
- Refurbish the mast and obtain boom and vang.
- Installation of the VHF radio and relocate 27MHz radio to main saloon.
- Antifoul bottom of boat.
- Make and install new rudder blade
These tasks make the vessel ready for sailing. The estimated time to perform this is approximately 1month.
- Install new shrouds and running rigging to the mast.
- Fit the headsail furler and step mast.
- Install seat on taffrail.